Order vs Timely Dispatch 100% as per PMS . All orders to be dispatched as per dispatch plan and within 48 Hrs. of receipt of specific orders.
Plan vs Production/Assembly 100% as per PMS
Packing material wastages Reduction to YY % from current XX % Wastage
RM & WIP wastage Reduction to YY % from current XX %
Inprocess Rejection Rate to be decreased to …….% (Ratio of Total Hold Material/Total Produced Material)
Failures in Job Card Execution wrt to Total Job Cards
Proper Management of Tool Shadow Board
To fill the daily production plan board
To fill DPR (Daily Production Report) for all Lines