1. To perform 100% visual inspection for the Final inspection and gauging inspection.
2. Sorting the OK & Not OK parts.
3. Moving out the non-conforming parts with identification.
4. Updating the rejection details to the reporting person.
5. Periodic updatation of inspection logs.
6. Checking parts with gauges, Vernier Calliper Micrometer and attribute gauges.