Nature of work:
1. Dismantle the Battery Packs.
2. Remove & Refitting of FPC’s in all Modules.
3. Cutting the module side plates.
4. Adding the PET stickers in all modules.
5. Adding the pressure plats on all modules.
6. Assembling the battery packs.
7. Maintain the campaign records (photos and books)