1. Physical visit and verification on 100% DT meter installed cases at deployed Circle:
2. 100% Achievements of Daily Visit Targets
3. All Required Parameters shared by QC team should be captured in the provided application along with the clear images
4. Follow the QC Checklist while doing the audit:
QC Field Auditor will ensure that the checklist provided by the company for the audit is followed without deviation, any parameter missing of checklist will cause for required action.
5. Highlight the major Gaps:
He will be responsible for highlighting the major issues (Meter installed on site but cable not connected, meter is lying on site without being fixed with the clamp, SMSC box is not properly sealed, etc.) found on site during the audit process
6. Other Task Assigned by Management as per business requirement:
He should be ready to take on the task that management will assign as per the business requirement.