● Check the production plan as per associate required .
● Chech the associate all bay wise deputed on the machine .
● Check all Machine run as per plan.
● Check production performance of last day.
● Check there is no un-identified parts arround injection moulding machine.
● Check change point board 5M+1E of previous shift.
● Prepare notes for morning meeting.