Plumber
Must Have knowledge of:-
- Hydropneumatic system
- Water parameters of drinking water (TDS, Hardness, PH, chlorine level)
- STP/WTP filteration process
- PPR (Polypropylene Random Copolymer pipe fitting) procedures: PPR fitting involves a heat fusion process: first, prepare the pipe (cut straight, deburr, clean) and heat the specialized fusion machine to ~260°C; then, insert the pipe and fitting into the heated dies for a specific time, join them quickly and straight without twisting, and hold the joint steady for several seconds to cool and form a single, leak-proof piece. This method creates a permanent, watertight bond ideal for hot and cold water systems.
- PRV system and operations