Roles & Responsibilities
Minimum office attendance must be 95%.
Pre-intimation of leave at least 4 days in advance is mandatory, and the leave application must be approved by the Service Manager (SM).
Candidate should attend 80% of in-house training conducted by COTEK.
Productivity should be 80% of the desired target, as checked through DMS/IRIS Reports.
Efficiency should be 80% of the desired target, as checked through DMS/IRIS Reports.
Internal repeat jobs should not exceed 10%; FI reports and analysis to be done by COTEK.
Must maintain 5S Process – neat and clean premises; tools and equipment should be properly arranged.
100% tools availability is required during monthly Tools Audit conducted by COTEK.
Read all Repair Orders carefully and complete all work as per customer verbatim/demanded repairs; consult with the Floor Supervisor for any additional repair requirements.
Complete all documentation as per CARE SOP, including Repair Order and Vehicle Inspection Sheet.